Navigate Up
Sign In

Measures of the Rural Development Programme 2014-2020

 
 
Standard Output Coefficients
 
The latest standard output coefficient values can be accessed on the Eurostat website on the
link below. To download the table click on ‘Malta’.
 

 

How to calculate the SO Value?

     How to calculate the SO Value?

 

 Block Procedure Timetable

     

Measure
Block 1
Block 2
Block 3
Block 4
Block 5
4.1
30.03.2017
01.06.2017
N/A
N/A
N/A
4.4
28.02.2017
27.04.2017
N/A
N/A
N/A
4.3
13.04.2017
N/A
N/A
N/A
N/A